Run a Report

1. To run a report that has previously been created, click the green arrow icon to refresh the information.

  • If you need to change the parameters (such as date range, etc), select the pencil and paper icon, change the filter for that field, then click Save and Generate

picture

2. To download the report as an Excel document, click Save as Excel

picture