|
Santisuk Village Project May 11-21, 2003 Chiang Mai, Thailand |
|
|
Thanks to all the people who made this trip possible! Read our press release here. |
|
Leach
Field Project |
Final
Design
|
|
|
Team: Deana
Aulisio, Lauren Dage, Seth Soos, and
Erin Stanisewski |
Before
|
After
|
|
Santisuk's previous septic system, which managed gray and black wastewater
for the school compound and two dormitories, drained directly into a
nearby river, creating stagnant pools and contaminating water used by
communities downstream. We installed
a leach field sytem to mitigate the environmental impacts and health
risks posed by the current infrastructure. |
|
![]() |
| Untreated sewage drains over land to the river | The new leach field is dug and ready to fill |
|
Reservoir
Project |
Final Design
|
|
|
Team: Mindy
Weimer, Jodie Barre, Jeff
Garnett , and Christian Kastrup |
Before
|
After
|
|
|
![]() |
![]() |
| The
previous filter clogged frequently |
Newly installed slow sand filters remove bacteria and protect the village water supply |