Quaker Run
Conditions Prior to Restoration
Please click on the image
to view larger.
|
 |
 |
 |
 |
| Upstream
end of Project at then In-Channel Sump for the Pump Around System
|
Upstream
Quaker Run and Aggravated Downcutting - August 2006 |
Existing
Upstream Reach - December 2005 |
Midway
Along Upper Quaker Run - February 2006 |
 |
 |
 |
 |
| Looking
Downstream from Twin 5 ft Culverts - February 2006 |
Leakage
from Downstream In-Channel Sedimentation Pond - Rip Rap Berm |
Erosion
Below Upstream Channel - Protection to Clay Layer - QR - November
2005
|
Channel
Widening and Deposition Upstream of Twin 5 ft Culvert - November 2005 |
 |
 |
 |
 |
| Detention
Pond Seepage - November 2005 |
Lower
Quaker Run In-Channel Sedimentation Pond - November 2005
|
Just
Downstream of the Twin 5 ft Culverts - December 2005 |
Extreme
Erosion in Left Overbank - June 2006 |
 |
 |
 |
 |
Channel
Downstream of Twin 5 ft Culverts Leading to Corrugate Culvert - November
2005
|
Close-Up
of Twin 5 ft Culvert - Outfall and Scour Hole - November 2005 |
Close-Up
of Twin 5 ft Culvert - Outfall Bank and Erosion - November 2005 |
Culvert
Inlet just Upstream of Twin Box Culverts - June 2006 |
 |
 |
 |
 |
| Culvert
Inlet Just Upstream of Twin Box Culverts - November 2005 |
Deposition
over Sewer Manhole - Lower Quaker Run - June 2006 |
Downstream
Site Conditions - December 2005 |
Left
Box Culvert and Sedimentation Build-Up at Pump Around Terminus - November
2005
|
 |
 |
 |
 |
Left
Twin Box Culvert Looking Upstream - August 2006
|
Right
Twin Box Culvert Looking Upstream - August 2006 |
Sediment
Build-Up - Right Channel Box Culvert - November 2005 |
Base
of Clay Layer Below Quaker Run - June 2006 |
 |
 |
 |
 |
Pump
Around Piping
|
Former
Coal Mine Entrance |
Bed
Profile |
River
Morph Profile |
 |
 |
|
|
Existing
Conditions RTK Survey
|
Existing
Site Conditions CAD Map |
|
|