Construction Pictures
Click on preview image to view full-size image. |
 |
Sedimentation forebay preceeding retention
pond. Forebay drains to pond through standpipe over 24 hour period.
Large flows bypass over weir shown in foreground. |
 |
L-shaped retention pond with slow release
standpipe. Pond contains bypass for storms larger than water quality
volume, or 1" of rainfall. |
 |
Stabilized inlet to retention pond forebay. |
 |
Stabilized outlet from overflow weir of
retention pond forebay. |
 |
Retention pond with standpipe and stabilized
overflow. Note erosion control matting on slopes 2 to 1 and greater. |