The gravel sub-drain is laid followed by
2' coarse sand filter. Because of the high infiltration rate, the
size of the sand filter bed can be minimized. |
 |
Illustration showing completion of sand
filter bed. |
 |
Erosion control matting around upper slopes
is required prior to vegetative slope stabilization. Erosion control
during construction and prior to stabilization is very important to
prevent clogging of the filter bed. |
 |
Close-up of coarse sand used in filter
bed. Filter bed maintenance includes removal of fines from the top
layer and, if needed, additional sand. |