Service Outage Log File - April 2004
Student VPN Downtime - 4/28/04
The Student VPN Server (both wireless and wired) will be down 4/28/4 from 12:00pm - 3:00pm for
hardware modifications. There is currently a Banner message to notify those users. This web page
will have the most current information at all times. If you have any questions/concerns, please
contact the CIS Help Desk & Dispatch Center at 862-4242.
Banner System Downtime - 4/25/04
BANNER HR, BANNER Finance, BANNER SIS, Web Intelligence Reporting System, InfoEd, Kronos and
Paybase Services will not be available on Sunday, April 25 from 7:00 AM until noon due to
maintenance on the Unix cluster.
Forest Park Network Unavailable - 4/16/04
The Forest Park cable modem network will be unavailable on Friday, 4/26/04 between the hours
of 9:00am and 4:00pm for maintenance. This outage is due to periodic maintenance and required
to maintain the integrity of the Forest Park cable modem network and prevent further service
interruptions as seen in the past few weekends.
This web page will have the most current information at all times.
If you have any questions/concerns, please contact the CIS Help Desk & Dispatch Center
at 862-4242.
Exchange Server Downtime 4/18/04
The Exchange servers will be down this Sunday 4/18/04 between 8:00am and 10:00am for critical updates
as well as hardware upgrades. This web page will have the most current information at all times.
If you have any questions/concerns, please contact the CIS Help Desk & Dispatch Center
at 862-4242.
CISUNIX Server Hypatia Downtime 4/15/04
The CISUNIX server Hypatia will be rebooted at 12:00pm Thursday, 4/15/04. Expected downtime
should not exceed 15 minutes. This web page will have the most current information at all times.
If you have any questions/concerns, please contact the CIS Help Desk & Dispatch Center
at 862-4242.
Webi Reporting System Downtime 4/15/04
The Web Intelligence Reporting System will not be available on Thursday, April 15 from 7:00 PM
until 9:00 PM due to maintenance on the middleware servers.
Planned Work - 04/12/2004 12:00am-1:30am
Global Crossing will be performing maintenance on equipment that provides UNH with commodity Internet connectivity.
This maintenance may affect connectivity to some Internet1 resources for UNH, KSC, PSU, and UNHM, as well
as NHCTC, GSDLN, CLL/CES, and NEAT networks. This maintenance will not affect WAN or voice trunking services
to KSC, PSU, or UNHM. This maintenance will not affect Internet2 connectivity to UNH, KSC, PSU or Dartmouth
College. Total length of maintenance will be approximately 20 minutes. Thank you for your patience, and we
apologize for any inconvenience.
ACS Server Downtimes 4/1/04
On Thursday, April 1, the Telecommunications department needs to
shutdown the network switch that provides connection to many of the
Academic Computing Systems (ACS) servers in order to replace a failing
component. This work is scheduled to take place at 7:00 AM and should
be completed by 7:45 AM, at the latest.
During this time, several of the servers which support the computer
systems managed by the ACS group will be unavailable. This includes
the following services:
- Mac OS X logins and applications
- KeyServer license management (backup license servers should take over for normal function)
- One of 3 Windows application (the other two should be available for normal function)
- FileMaker Server database hosting including the databases for the training.unh.edu web site
- Access to SPSS, Maple, Matlab, Small Stata, and other applications hosted on ACADEMIC
- The LEARNLINC server
- The IDCVIDEO server
If you have any questions about this notice or experience problems with
these services after 7:45 AM, please call 862-3667 and request to speak
to the Academic Computing Systems group.
Banner SIS Server Downtime 4/1/04
The front-end servers for BANNER SIS will be unavailable on Thursday, April 1 from 7:00 PM until 9:00 PM for software maintenance.
1 Leavitt Lane Generator Test - 04/04/04
The 1 Leavitt Lane machine room generator has been experiencing some leakage from the engine recently. CIS has been advised to run an extended load test to ensure
optimal performance which will conducted Sunday, April 4 from 7:00 am until noon. This test requires an exchange in the Data Center's power source to the generator.
Although the risk is low, the possibility exists that the generator or transfer switch may fail resulting in a total loss of power which could have an effect on service. It
is critical that this test be executed immediately to determine the cause of the current problem.
This web page will have the most current information related to this test. If you have any questions/concerns, please contact the CIS Help Desk & Dispatch Center at
862-4242.
|